Futures Calculator

KuCoin Liquidation Calculator

XBTUSDTM · Parameters checked: 2026-10-01

KuCoin XBTUSDTM, isolated one-way margin. Enter BTC quantity (one contract = 0.001 BTC). Risk tier is selected from opening notional. The editable reserve includes liquidation fees; expected funding is entered separately.

Liquidation price
54,249.55 USDT
Adverse move that liquidates
9.58 %
Maintenance rate at liquidation
0.40 %
Maximum entry leverage
125×

KuCoin maintenance margin tiers

Position valueMaintenance margin rate (%)Max leverageMaintenance deduction
250,000 USDT0.40 %125×0
600,000 USDT0.50 %100×0
2,500,000 USDT0.70 %75×0
10,000,000 USDT1.00 %50×0
50,000,000 USDT1.70 %30×0
90,000,000 USDT2.50 %20×0
185,000,000 USDT5.00 %10×0
400,000,000 USDT10.00 %5×0
500,000,000 USDT12.50 %4×0
650,000,000 USDT16.70 %3×0
1,000,000,000 USDT25.00 %2×0
1,500,000,000 USDT50.00 %1×0

Liquidation price on KuCoin

Enter average entry, BTC quantity and available margin. The result shows the estimated mark-price threshold, distance from entry and applied maintenance rate. This is a threshold estimate, not a guaranteed execution price.

Liquidation balance equation

Let E be entry, q quantity, M available margin, d direction (+1 long, −1 short), c the maintenance rate plus reserve, and A the maintenance deduction. At the threshold, M + d × q × (P − E) = q × P × c − A. Solving gives P = (d × q × E − M − A) ÷ [q × (d − c)]. Already-paid fees and funding must be deducted from the margin you enter.

The risk tier is selected from opening value. Its rate applies to mark value, with the liquidation-fee reserve and the funding reserve you enter. Example: 1 BTC, entry 30,000, margin 600, maintenance 0.4%, fee 0.06%, funding reserve 0. The long threshold is 29,400 ÷ 0.9954 = 29,535.8650 USDT.

What to verify before using the result

Parameters are a dated snapshot rather than current account data. Verify your contract, margin mode and current limits on the venue. Other positions, orders, margin changes and mark/index differences can move the threshold. A planned stop-loss and estimated liquidation answer different questions.

FAQ

Why is size entered in BTC instead of contracts?

Contract multipliers differ. Convert contract count into base-asset quantity using the specification. Price and margin use the quoted contract's own quote currency.

Can I use the result for a different margin mode?

Use only the mode stated above the calculator. A different mode or contract requires checking its collateral equation and maintenance requirements separately.

Is liquidation price the exit fill price?

No. It is the estimated threshold under the stated assumptions. Execution, partial liquidation and other venue-engine actions can occur at different prices.

Liquidation price on a specific exchange

These pages already carry the venue's own published numbers, so there is nothing to look up — and each cites the documentation it was built from.