Bitget Liquidation Calculator
BTCUSDT · Parameters checked: 2026-10-01
Bitget BTCUSDT, classic-account isolated one-way margin, positions opened from 10 November 2025. The tier and deduction are resolved at the liquidation mark price. Older positions, hedge mode and unified accounts use different rules.
Bitget maintenance margin tiers
| Position value | Maintenance margin rate (%) | Max leverage | Maintenance deduction |
|---|---|---|---|
| 200,000 USDT | 0.40 % | 150× | 0 |
| 1,000,000 USDT | 0.50 % | 100× | 200 |
| 5,000,000 USDT | 0.70 % | 75× | 2,200 |
| 15,000,000 USDT | 1.00 % | 50× | 17,200 |
| 50,000,000 USDT | 2.00 % | 25× | 167,200 |
| 100,000,000 USDT | 3.00 % | 20× | 667,200 |
| 150,000,000 USDT | 6.00 % | 10× | 3,667,200 |
| 300,000,000 USDT | 12.00 % | 5× | 12,667,200 |
| 500,000,000 USDT | 15.00 % | 4× | 21,667,200 |
| 700,000,000 USDT | 20.00 % | 3× | 46,667,200 |
| 900,000,000 USDT | 30.00 % | 2× | 116,667,200 |
| 1,200,000,000 USDT | 60.00 % | 1× | 386,667,200 |
Liquidation price on Bitget
Enter average entry, BTC quantity and available margin. The result shows the estimated mark-price threshold, distance from entry and applied maintenance rate. This is a threshold estimate, not a guaranteed execution price.
Liquidation balance equation
Let E be entry, q quantity, M available margin, d direction (+1 long, −1 short), c the maintenance rate plus reserve, and A the maintenance deduction. At the threshold, M + d × q × (P − E) = q × P × c − A. Solving gives P = (d × q × E − M − A) ÷ [q × (d − c)]. Already-paid fees and funding must be deducted from the margin you enter.
Maintenance applies each rate to the portion of position value in its bracket. Deduction keeps the requirement continuous: next deduction = previous deduction + previous upper bound × rate difference. The calculator accepts the root only inside its liquidation-price bracket. For a 330,000 USDT position, the first 200,000 uses 0.4%, the remaining 130,000 uses 0.5%; with a 0.06% fee, the total requirement is 1,648 USDT.
What to verify before using the result
Parameters are a dated snapshot rather than current account data. Verify your contract, margin mode and current limits on the venue. Other positions, orders, margin changes and mark/index differences can move the threshold. A planned stop-loss and estimated liquidation answer different questions.
FAQ
Why is size entered in BTC instead of contracts?
Contract multipliers differ. Convert contract count into base-asset quantity using the specification. Price and margin use the quoted contract's own quote currency.
Can I use the result for a different margin mode?
Use only the mode stated above the calculator. A different mode or contract requires checking its collateral equation and maintenance requirements separately.
Is liquidation price the exit fill price?
No. It is the estimated threshold under the stated assumptions. Execution, partial liquidation and other venue-engine actions can occur at different prices.
Sources and further reading
Liquidation price on a specific exchange
These pages already carry the venue's own published numbers, so there is nothing to look up — and each cites the documentation it was built from.